Back to Phase 0

Phase 0 sample

Illustrative example · Metal enclosures for industrial equipment

A manufacturer is evaluating production in Mexico to serve customers in Mexico and the United States. Its initial plan is to import steel sheet and components, then cut, bend, weld and finish the product in Mexico.

Investment recommendation

Proceed with Changes

Move to technical and cost validation before committing to machinery or signing for a site. The investment decision depends on confirming classification, sourcing and facility requirements.

Findings and next steps

Classification and origin

Confirm the classification of the enclosure and critical inputs. Compare the applicable origin rule with the bill of materials and the operations actually planned in Mexico.

Sourcing scenarios

Compare imported steel sheet with a regional alternative. Estimate landed cost, freight, duties and lead times, and check supplier documentation for each option.

Facility and process

Confirm power, ventilation and permits for welding and finishing under the selected process. Compare operating a dedicated facility with contract manufacturing.

A fictional case showing the study format. Findings and recommendations depend on each project’s data.

Contact us